+380674935862Request a call

HomeCatalogResidential ModulesResidential WagonDemountable accommodation module 30 sq. m

Demountable accommodation module 30 sq. m

The demountable accommodation module of 30 sq. m consists of two separate structures combined into a single building. The layout includes two bedrooms and an entrance hall. The structure is insulated with mineral wool and equipped with an electrical network, ventilation and air conditioning. The module is designed for temporary accommodation.

  • Total area30 sq.m
  • Overall Dimensions (L×W×H)10000х2410х2600 mm
  • Ceiling Height2250 mm
  • Product code209
Key Characteristics
Type of Structure Rapid-assembly module
Number of Modules 2
Number of Buildings 1
Layout 3 separate rooms
Exterior Finishing Metal
Profiled sheet metal
Epoxy primer
Polyurethane paint
Interior Finishing Laminated chipboard
Cement-bonded particle boards
Linoleum
Thermal Insulation Mineral wool
Engineering Systems Electrical system
Ventilation
Air conditioning
Equipment and Furnishing Furniture
Technical equipment
Lighting
Engineering systems
Project Features Connection of two modules into a single building
External generator platform
Project Timeline 20 working days

The accommodation module is designed as a rapid-assembly structure comprising two separate modules combined into a single functional building. The layout includes two bedrooms and an entrance hall, enabling the organisation of temporary personnel accommodation at construction, industrial and other facilities.

The structure is adapted for on-site installation and can be operated across a range of geographic and climatic conditions. Mineral wool insulation, ventilation and air conditioning provide the necessary living conditions. For autonomous power supply, the use of a generator or solar panels is recommended.

The demountable structure simplifies transportation of the building. Assembly is completed within one day. Layout and fit-out are agreed with the client prior to manufacture.

30 sq.m Total area
2 Modules
20 workdays Production timeline
3 Functional rooms
Get a quote

You may also like

Contact us!

xmodule map